ARIMA Sumika

Researcher's full information

Articles
  • Dynamic Capacity Allocation and Scheduling for Multi-type Resource Sharing Systems
    有馬 澄佳
    Proceedings of the 13th International Symposium on Operations Research and Its Applications (ISORA2018)/pp.1-12, 2018-08
  • Applications of Sparse Modelling and Principle Component Analysis for the Virtual metrology of comprehensive multi-dimensional quality
    有馬 澄佳
    Proceedings of International Conference on Operations Research and Enterprise Systems (ICORES) 2019/pp.1-8, 2019-02
  • Optimization of Multi-type Resource Allocation for MTO-MTS mixed production
    Arima Sumika; MOTOMIYA Hiroyuki
    Proceedings of The International Symposium on Semiconductor Manufacturing 2018 (ISSM2018)/pp.1-4, 2018-12
  • Real-time Allocation of Multi-Type Production Resource with Due Date grouping for MTO Manufacturing
    Arima Sumika; TANAKA Motoharu
    Proceedings of The International Symposium on Semiconductor Manufacturing 2018 (ISSM2018)/(2018)/pp.1-4, 2018-12
  • Forecasting Call Center Arrivals using a Hybrid Model composed by Multiple Regression and LSTM
    有馬 澄佳; 秋山裕; 張ウトン; 佐藤宏哉
    Proceedings of The 13th International Symposium on Operations Research and its Applications in engineering, technology and management (ISORA 2018)/pp.1-6, 2018-08
  • Common sensing and Analyses to visualize a Production Process with Parallely Utilized Resource –Job-shop and Flow-shop cases
    有馬 澄佳; 田中元晴; 永田拓也; 西雄介
    Proceedings of IIAI 7th International Congress on Advanced Applied Informatics (AAI2018)/pp.1-6, 2018-07
  • Development of a Hybrid-flow Scheduling System Considering with Individual Due-date and Uncontrollable Processing Time for MTO Production
    有馬 澄佳; 篠田憲汰; 小野寺翔
    Proceedings of 7th International Congress on Advanced Applied Informatics/pp.1-5, 2018-07
  • Work Study System Using Indoor Positioning Technology
    有馬 澄佳; 辻拓幹; 小塚雄平
    Proceedings of 7th International Congress on Advanced Applied Informatics/pp.1-6, 2018-07
  • 民間データの活用による既存指標の精度向上-地域活性度指標と因果構造モデル
    Arima Sumika; 石川直樹; 石崎祐莉
    新しい経済産業指標開発コンテスト2016最終報告会要綱/pp.1-28, 2017-02
  • Sparse Modeling for Automatic Extraction of Variables to build accurate Virtual Metrology Model
    Arima Sumika; ISHIZAKI Yuri; HuiZhen Bu
    Proceedings of AEC/APC Symposium Asia 2017/pp.1-4, 2017-11
  • 半導体製造における装置とプロセスの監視・予測・処置のための機械学習とデータマイニング手法の応用
    Arima Sumika
    精密工学会プラナリゼーションCMP委員会研究会 第150回記念要綱集/pp.1-6, 2016-06
  • Dynamic Scheduling of Product-mix Production Systems of MTS and MTO
    Arima Sumika; ZHANG Yutong; AKIYAMA Yutaka; TAKAMATSU To...
    Proceedings of IEEE International Symposium on Semiconductor Manufacturing 2017/pp.1-4, 2017-09
  • Real-time Shceduling of HMLV Productions using the Optimum Production Cycle extended by ATSP Solver
    Arima Sumika; BU Huizhen; Wang Yi-Fang
    Proceedings of IEEE International Symposium on Semiconductor Manufacturing 2017, 2017-09
  • Real-time Resource Allocations and Shceduling of Product-mix Production Systems with Multi-type jigs
    Arima Sumika; AKIYAMA Yuaka; TAKAMATSU Toshiyuki; BU Hui...
    Proceedings of IEEE international symposium on Semiconductor Manufacturing (Joint symposium e-MDC and ISSM2017)/pp.1-4, 2017-09
  • 持続可能な都市・地域に向けた地域活性化指標の構築と施策評価
    有馬 澄佳; 石川直樹; 桜井一穂; 今津創
    Development and evaluation of comprehensive indexes designed for regional vitalization for the sustainable city and country/2015/pp.63-66, 2015-09
  • OPTIMIZATION OF RE-ENTRANT HYBRID FLOWS WITH MULTIPLE QUEUE TIME CONSTRAINTS IN BATCH PROCESSES OF SEMICONDUCTOR MANUFACTURING
    Arima Sumika; Kobayashi Akihiro; Wang Yi-Fan; Sakurai Kazuho...
    IEEE Transaction on Semiconductor Manufacturing/28(4)/pp.528-544, 2015-11
  • Development of Database and Comprehensive Indexes for Opening Valuation of Local Activities in Japan - analysis of 125 cities of Ibaraki, Shiga, and Tokyo prefectures
    有馬 澄佳; Ishikawa Naoki; nakatani Ryosuke; Monma Yusuke
    Proceedings of the 2014 IEEE Conference on e-Learning, e-Management and e-Services (IC3e 2014)/pp.134-139, 2014-12
  • Virtual Metrology-based Engineering Chain Management by Multi-classification of Quality using Support Vector Machine for Semiconductor Manufacturing
    Sumika Arima
    International Journal of Industrial and Systems Engineering/8(1)/pp.1-18, 2011-02
  • Proactive Control of Engineering Operations and Lot Loadings of Product-mix and Re-entrant in Q-time Constraints Processes
    Sumika Arima; Akihiro Kobayashi; Takahiro Kuno
    Proceedings of IEEE Joint Symposium of e-Manufacturing & Design Collaboration Symposium 2013 and International Symposium on Semiconductor Manufacturing 2013, 2013-09
  • Re-entrant Flow Control in Q-time constraints Processes for actual applications
    Arima Sumika; Naoto Toyoshima; Tsubasa Hasegawa; Wu Ke
    Proceedings of IEEE Joint Symposium of e-Manufacturing & Design Collaboration Symposium 2013 and International Symposium on Semiconductor Manufacturing 2013, 2013-09
  • 日米欧の研究開発コンソーシアムの比較分析に基 づく日本のエレクトロニクス産業への提言
    有馬 澄佳
    経営工学会 春季大会/pp.110-111, 2013-05
  • 東日本大震災時の支援物資物流問題を対象とした4MI(*)因果分析と今後に向けた支援方式の提案
    有馬 澄佳
    経営工学会 春季大会/pp.80-81, 2013-05
  • 環境配慮製品の継続発展型購買モデルの構築と検証
    有馬 澄佳
    H25年度春季大会予稿集/pp.26-27, 2013-05
  • Novel dispatching rule for re-entrant flow control in Q-time constraints processes
    Akihiro KOBAYASHI; Shu Kai Ming; Sumika ARIMA
    Proceedings of International Symposium on Semiconductor Manufacturing 2012/p.MC-P-60 (pp.1-4), 2012-10
  • Optimal Control of Engineering Operations on Production Tools in Semiconductor Manufacturing
    Naoto Toyoshima; Sumika Arima; Takuma Daiku
    Proceedings of International Symposium on Semiconductor Manufacturing/p.MC-P-61 (pp.1-4), 2012-10
  • more...